For Developers

SANS XA approved solar hot water for property developments.

SANS XA approved solar hot water for property developments.

The Geyser Gecko fits every unit in a development with hybrid solar hot water at a fraction of the cost and install time of thermal solar systems, with volume pricing and coordinated installer rollout.

The Geyser Gecko fits every unit in a development with hybrid solar hot water at a fraction of the cost and install time of thermal solar systems, with volume pricing and coordinated installer rollout.

PV active49.6°C

SANS XA

Compliant per-unit installation

3–5 hrs

Install time per unit

No plumbing

Retrofits onto standard geysers

SOME OF OUR TRUSTED partners

  • Tri Star logo
  • Tri Star logo
  • Cosmopolitan logo
  • Calgro logo
  • Bidvest logo
  • Axiz logo
  • Tri Star logo
  • Tri Star logo
  • Cosmopolitan logo
  • Calgro logo
  • Bidvest logo
  • Axiz logo

Specification notes

Compatible with standard electrical geysers

No change to your standard geyser specification or plumbing layout across units. The Gecko controller and PV panels are added at final fix.

Lower cost per unit than thermal solar

No roof-mounted tank, no vacuum tubes, no dedicated plumbing run. Panels connect directly to the controller at the geyser.

Volume pricing and phased scheduling

Pricing scales with unit count. Installation is scheduled across our certified installer network to match your build programme.

Marketable as a green-building feature

Each unit ships with app-based monitoring, giving future occupants visible, ongoing energy savings.

24 panels2 per unit
12 Geyser GeckosOne in each unit's DB boardNothing for tenants to do
Site grid supply
geysers on solarno geyser spike
Site grid demand · 24h
12am6am12pm6pm12am
Without GeckoWith GeckoSolar heating
Daytime24 panels heat 12 geysers while the sun is up.
6pm peakThe water is already hot, so 12 geysers don't hit the grid at once.
SANS 10400-XA · 50% of hot water from solar

Process

01

Consultation

Confirm unit count, geyser specification, and build programme.

02

Bulk quote

Volume pricing issued based on unit count and site access.

03

Phased install

Certified installers work through units on a schedule coordinated with your site team.

04

Handover

Compliance documentation and app access provided per unit at handover.

Case studies

Live developments running on Geyser Gecko

Tri-Star Construction · Fleurhof, Gauteng

Tri-Star Construction · Fleurhof, Gauteng

260 units live, 600 more coming

Up to R1.08 million saved on grid electricity every year.

Tri-Star needed to cut electricity costs for residents without risking hot water during load shedding. Dark Line fitted Geyser Gecko units across the Fleurhof development: solar heats first, the grid is only the backup, and every unit is visible from day one in the Gecko Hub.

CDP · Mixed-use development

CDP · Mixed-use development

600 units retrofitted, no disruption

Up to R2.6 million saved on grid electricity every year.

CDP wanted a retrofit that worked with their existing geysers and didn’t mean major changes to the property. Each zone (residential, retail and common areas) runs its own settings, all managed from a single Gecko Hub, cutting peak demand at high-load times.

Request a quote for your development

Send us your unit count and build programme and we’ll come back with pricing and a proposed installation schedule.